N3 Project Management Modules

A series of information essays and outlines for property buyers, owners, and investors — because approvals are the beginning of a building project, not the end of it.

Understanding Comes Before Execution

Securing an approval is a milestone. It is not a finish line.

Our Modules provide implementation guidelines for evaluating and managing your building or land development project once approvals have been secured. Presented as a series of information essays and outlines, they close the gap between approval granted and project executed — in the sequence it actually happens, in language written for the property owner rather than the plans examiner.

Each module is an advisory guideline, to be used in conjunction with information provided by your building department, surveyor, building contractors, and engineering firms.

Module 01 — Building Site Preparation

A Builder Assist Advantage Program Review

Part 1 — Start Considerations

Three inputs govern the first step of site preparation: municipal zoning requirements, property characteristics, and your home placement preferences.

Once those are established, site preparation is guided by a Site Plan — a geographic blueprint dictating where the home and driveway can and will be placed on the building site. This blueprint is essentially an enhanced survey map.

The site map should identify:

  • The proposed home placement, dimensioned against the front, rear, and side line boundaries of the property
  • The driveway location, for purposes of ingress and egress to the home and building site

Once the Site Plan is completed and approved by the Building and Highway Departments having jurisdiction over the project, site preparation activities can be planned.

The approved Site Plan functions as an administrative platform for the development of a site-specific Building Envelope, defining where site preparation activities will be required. Preparation should be geared to allow site access to surveyors for foundation and driveway stakeouts, to contractor labour, to excavation equipment, and to building material deliveries for driveway and foundation materials.

Part 2 — Administrative Factors

The Site Plan, as approved by the Building and Highway Departments, should be reviewed with the contractor tasked with preparing your building site for construction activities. Then confirm the following before anything moves.

  • Are all permits in place, and have all departments having jurisdiction over the building project been advised of the start date?
  • Have all home plans, property site plan surveys, and stakeouts been reviewed and ordered by you and your contractors — defining the size, content, and location of the home or addition being constructed?
  • Has notification been provided to towns, counties, utility companies, and municipal water and sewer departments advising that excavation work will be starting?

Most towns and counties maintain a central contact number which by law must be called to give notification of the start of impending construction and excavation activities at a specific location. Once called, you will be given an authorisation number which acts as documentation of your adherence to the required notification procedure. Do not start any excavation activity until you are cleared to start by all departments having jurisdiction over your building project.

 

  • Are all permits in place, and have all departments having jurisdiction over the building project been advised of the start date?
  • Have all home plans, property site plan surveys, and stakeouts been reviewed and ordered by you and your contractors — defining the size, content, and location of the home or addition being constructed?
  • Has notification been provided to towns, counties, utility companies, and municipal water and sewer departments advising that excavation work will be starting?

 

Part 3 — Property Site Preparation Factors

Factors associated with preparation of the building site will vary depending on the unique site and building department requirements associated with your project. The following have historically proven advisable to implement prior to the start of site preparation activities.

Erosion control

Has an understanding of the content and location of any required erosion control fencing been established, and the fencing installed, prior to the start of the building project? Placement of pre-construction erosion control systems is an important consideration in preparing the site in advance of construction — especially as it relates to excavation-related site preparation functions.

Stakeout and clearing

Has the home site location been staked out for the purpose of defining the areas where trees and foliage are to be cleared or retained? Are the home and access driveway locations identified with the appropriate stakeouts, in accordance with the site plan survey map specifications?

Driveway grading

Are gradient stakes required for the driveway to maintain grade compliance? Is there an understanding of what driveway base and apron materials are needed — both to allow ingress and egress for contractors and equipment, and to provide proper driveway apron material to avoid soil erosion deposits on adjacent roadways and neighbouring properties?

Buried utilities

Have all buried utility lines been identified and marked by the respective utility companies, or by the water and sewer departments requiring department input? Have authorisation numbers or codes been provided acknowledging your compliance with their notification procedures?

Part 4 — Implementing Objectives

The core implementing objective of the site preparation phase is to prepare the building site to accept contractor labour, excavation equipment, and the construction materials necessary to start the building project.

Once the areas of the building site where the home and its support components and systems are defined and identified — the defined building envelope — work can start to efficiently prepare the site for construction preparatory activities.

Activities include, but are not limited to:

  • Tree clearing and removal, and tree de-stumping
  • Rock and boulder removal, and removal of any obstacle or structure within the building envelope that affects or influences site preparation
  • Driveway access cut-ins and grading
  • Placement of driveway stabilising and erosion-preventive materials
  • Erosion fencing, as may be required
  • Foundation area grading, in anticipation of constructing the home’s foundation and drainage systems

The administrative factors, coupled with an understanding of the property’s site preparation requirements, allow labour and excavation work to proceed within the defined building envelope as established in the site plan map and home requirements.

Summary Notes

This Building Site Preparation tutorial functions as an advisory guideline on the proper way to start a building project. All building sites and site plans have their own unique set of building project requirements, which must be addressed and adhered to prior to and during site preparation activities.

The information contained in this tutorial is to be utilised in conjunction with information provided by your building department, surveyor, building contractors, and the engineering firms retained to design and implement your site plan design.

Module 02 — Real Estate Investment Evaluation

Available to Advantage Program participants

The four-component evaluation framework — local property values, building site development cost initiatives, existing and planned area zoning ordinances, and existing or planned town, county and state infrastructures — presented with the three documented equity-enhancement case studies.

Module 03 — Subdivision Development & Completion

Available to Advantage Program participants

The start-to-completion administrative framework: excavation equipment and road material determination, utility system installation, cost-to-value feasibility and point-of-diminishing-returns analysis, drainage and retention pond review, contractor incentive structuring, and municipal inspection scheduling.

More information on this property development investment evaluation is available upon request.